Wagner-Meinert, LLC Safety Services & Ammonia Training
  • Safety Services
    • About
    • Contact
    • Safety and Compliance Services Southwest
    • Resources
  • Training
  • Program Development
    • General Industry Safety Program Development
    • Construction and Contracting Safety Program
    • Ammonia Refrigeration Management Low Charge
    • Ammonia Refrigeration Management
    • PSM/RMP Program Development and Maintenance
  • Program Maintenance
    • PSM/RMP Management
    • Contract Safety Director
    • Management of Change Assistance
    • Annual Ammonia Inspection/Mechanical Integrity Inspections
    • Mechanical Integrity
    • Process Hazard Analysis
    • Personal Protective Equipment Assessment
    • Evaluación del Equipo de Protección Personal
    • Lockout/Tagour Machine Specific Procedures
    • Development Maintenance Procedures
    • Development Standard Operating Procedures
    • Risk Management Submittals
    • PSM/RMP Compliance Auditing
    • Risk Management Auditing
  • WMi Home
  • Safety Services
    • About
    • Contact
    • Safety and Compliance Services Southwest
    • Resources
  • Training
  • Program Development
    • General Industry Safety Program Development
    • Construction and Contracting Safety Program
    • Ammonia Refrigeration Management Low Charge
    • Ammonia Refrigeration Management
    • PSM/RMP Program Development and Maintenance
  • Program Maintenance
    • PSM/RMP Management
    • Contract Safety Director
    • Management of Change Assistance
    • Annual Ammonia Inspection/Mechanical Integrity Inspections
    • Mechanical Integrity
    • Process Hazard Analysis
    • Personal Protective Equipment Assessment
    • Evaluación del Equipo de Protección Personal
    • Lockout/Tagour Machine Specific Procedures
    • Development Maintenance Procedures
    • Development Standard Operating Procedures
    • Risk Management Submittals
    • PSM/RMP Compliance Auditing
    • Risk Management Auditing
  • WMi Home
Wagner-Meinert, LLC
7617 Freedom Way
Fort Wayne, Indiana 46818
​

Phone: (260) 489-7555
After Hours: (800) 210-6621
Fax: (260) 489-7473

Risk Management Submittals

A Risk Management plan is required to be submitted electronically to the Environmental Protection Agency every five years or when other significant changes occur.  This plan questionnaire contains questions pertaining to the RMP / PSM program.
Picture
A worst case release scenario and an alternate release scenario must be included in the submittal.  Wagner-Meinert, LLC personnel prepare the models based on scenarios selected by facility personnel.  While our personnel will make suggestions, the facility representative will be required to make the final decision as to which scenarios will be submitted.  The scenarios would be selected based on the Process Hazard Analysis, reanalyzed, and recalculated.  This includes population exposures, per the latest census data and a list of public receptors.

An evaluation of previous accidents will be performed and included in the plan submittal.

Wagner-Meinert, LLC personnel would complete the submittal online and work with facility personnel to verify that the information is submitted correctly.  The last submission would be used as a template to begin the new submittal.  Additional information and dates will be required.  The Wagner-Meinert, LLC representative will work with the facility representative to compile the new information.  Following the preparation of the submittal, facility personnel must certify the submittal online.
Download Risk Management Submittals.pdf
Return to Program Maintenance
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Refrigeration, Mechanical & Food Process
  • Safety Services
    • About
    • Contact
    • Safety and Compliance Services Southwest
    • Resources
  • Training
  • Program Development
    • General Industry Safety Program Development
    • Construction and Contracting Safety Program
    • Ammonia Refrigeration Management Low Charge
    • Ammonia Refrigeration Management
    • PSM/RMP Program Development and Maintenance
  • Program Maintenance
    • PSM/RMP Management
    • Contract Safety Director
    • Management of Change Assistance
    • Annual Ammonia Inspection/Mechanical Integrity Inspections
    • Mechanical Integrity
    • Process Hazard Analysis
    • Personal Protective Equipment Assessment
    • Evaluación del Equipo de Protección Personal
    • Lockout/Tagour Machine Specific Procedures
    • Development Maintenance Procedures
    • Development Standard Operating Procedures
    • Risk Management Submittals
    • PSM/RMP Compliance Auditing
    • Risk Management Auditing
  • WMi Home